Standard Description
Outfitted using the zero leak bidirectional checking sole-noid valves, this energy unit is designed for your operation of two independent circuits. Which are respectively for your major and subordinate platforms with the double scissors lift. Two cut-off valves are applied for reducing the machine manually in case of energy loss. If extra independent circuits are essential for the application please contact us for availability.
Remark: one. Please check with our income engineer for the diverse pump displacement, motor electrical power or tank capability.
2. CSA or UL licensed motors are available upon request.
Exclusive Notes
1. The AC motor is of S3 duty cycle, which might only perform intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean all the hydraulic elements concerned ahead of set up of the power unit.
three. Viscosity in the oil shoud be 15~46 cst,plus the oil ought to be clean and free of impurities,N46 hydraulic oil is recommended.
4. The energy unit should really be mounted vertically.
5. Check the oil level within the tank immediately after the first running from the electrical power unit.
6. Oil altering is required following the original 100 operation hours,afterwards once every 3000 hrs.